Baira Siul Project, Surangani


This thread is for the information about Baira Siul Project, Surangani

Baira Siul Project, Surangani

Introduction:

Baira Siul Project is a hydro electricity generation plant. It is the very first project of NHPC. This project is made on the combination of inflow of three tributaries of the Ravi river, namely Baira, Siul and Bhaledh for generation of power.

Location: It is located at 42 kms from Chamba and 135 kms from Pathankot

Adress: Baira Siul Project, Surangani

Distt: Chamba, Himachal Pardesh

Pin Code: 176317

Other Information:

Installed Capacity: 180 MW (3 x 60 MW) uprated to 198MW

Type of turbine used: Francis

Year of Commissioning: 1981

Commercial production started : 01/04/1982.



Following Sates are benefited from this project: Himachal Pardesh, Punjab, Haryana & Delhi


Related Articles

Kala Amb

Kala Amb is situated in Sirmaur and it is the industrial area of Sirmaur.

More articles: Himachal Information

Comments



  • Do not include your name, "with regards" etc in the comment. Write detailed comment, relevant to the topic.
  • No HTML formatting and links to other web sites are allowed.
  • This is a strictly moderated site. Absolutely no spam allowed.
  • Name:
    Email: